Formwork // Shoring

Our Formwork and Shoring services offer you the best possible solutions for shoring and floor formwork. This includes vertical and horizontal shoring during renovations, as well as floor and beam shoring for new construction.

The staff at BUILLT® has many years of experience in the installation of supports and (floor) formwork. We engineer and install in accordance with the scaffolding guidelines and the concrete support guidelines.

View all our services
Industrial photo: GASS

We speak the language of construction and put the customer first. We provide tailored technical advice and guarantee quality, safety, and customer-friendliness.

Some of the services we provide as part of our Formwork & Shoring division:

  • Scaffold supports.
  • Heavy-duty support (ALU).
  • Stamps with H20 backing.
  • Floor formwork systems.
  • Traditional floor formwork.
  • Special HD shoring systems.
  • Specials.

Traditional Support

For shoring concrete floors, shoring props and HV system beams, aluminum beams, H20 girders, or formwork are used. During the cost estimation phase of your project, the best solutions for the job are identified, which determines the system to be used and the shoring plan.

WhatsApp Image August 27, 2024, at 6:55:39 p.m. (2)

Scaffold Support

Scaffolding equipment is ideal for temporarily supporting concrete structures in new construction and renovation projects. This includes support beams and joists in the form of battens or H20 girders. When necessary, aluminum beams can be used instead.

WhatsApp Image August 27, 2024, at 5:54:20 p.m.

Heavy-duty aluminum support

When stamps and supports do not seem to be the best solution, a support system is used. For heavy strips or great heights, it is safer and more cost-effective to use a support system. When the support requirements are above average, we consider a heavy-duty solution or the use of aluminum supports for heavier and more specialized work.

2012-03-09-013

Floor Formwork System

When providing support for wet floors, we use the HV Combi floor formwork system in addition to traditional deck formwork. Our staff has extensive experience in assembling the props and panels, allowing us to offer excellent value for money on floors poured on-site.

The required openings and edge forms are traditionally made from concrete plywood. By using materials efficiently, the amount of material needed during re-shoring can be kept to a minimum. This, in turn, results in savings on rental and labor costs for the customer.

Traditional carpentry on the construction site

BUILLT® delivers the floor to the client so that the next trade can begin its work. Once the supports and floor formwork have been installed, our support builders—carpenters—construct the openings and edge formwork.

If desired, this includes removing the formwork from the column heads or installing edge and/or beam formwork on-site.

Discover our other services

View all services

We'd be happy to support you with your project—please let us know how we can help.

 

Do you have a question about our services or what we offer, or would you like to schedule an appointment? Please don't hesitate to contact us or fill out the form below.

We'll take it like that We will contact you as soon as possible.

We look forward to a long-term partnership!

BUILLT®

  • Ekkersrijt 7051
  • 5692 HB Son en Breugel
  • The Netherlands