A Key Project for the Energy Transition

At the Maasvlakte, BAM Infra Nederland is carrying out the civil engineering work for the 2GW IJmuiden Ver Beta project on behalf of TenneT. This project involves the construction of a high-voltage converter station that converts renewable electricity generated by wind farms in the North Sea and makes it suitable for transmission via the Dutch high-voltage grid. The converter station thus forms a crucial link in the energy transition and will eventually supply sufficient renewable electricity for millions of households.

BAM Infra is responsible for constructing the buildings, foundations, and the entire site layout of the converter station. By utilizing innovative 2GW technology, significantly more renewable energy can be brought ashore via a single connection, enabling the power grid to be expanded more efficiently, more quickly, and in a future-proof manner. The work at the Maasvlakte is part of a nationwide rollout of multiple 2GW converter stations that will be constructed in the coming years.

Project Information

BUILLT was selected to carry out the 2GW Ver Beta project because of its specialized knowledge and experience in the areas of floor formwork, support structures, scaffolding, and suspended scaffolding. Starting with the preparatory phase, BUILLT has worked closely with BAM Infra and the other construction partners involved to develop safe, efficient, and technically sound solutions for each phase of construction.

An important part of our work involved designing and providing advice on tall, freestanding stair towers for the construction of the imposing concrete walls, which were built by the specialist firm Gleitbau Salzburg. Thanks to thorough 3D BIM engineering, a carefully developed method statement, and a strong focus on safety, the work was carried out in a controlled manner and according to schedule.

The collaboration between BUILLT, BAM Infra, and all partners involved is characterized by open communication, short lines of communication, and a shared commitment to safe, high-quality construction. Thanks to this successful collaboration, the structural work on the Ver Beta building has now been successfully completed. Work is currently underway on the interior finishing.

Following this success, BUILLT immediately began work on the Ver Gamma building. In addition, at a later stage, BUILLT will also provide the temporary access facilities, support structures, and ihwg floors for Nederwiek, the third 2GW converter station on the Maasvlakte. In doing so, BUILLT is making a structural contribution to the expansion of the Dutch energy infrastructure and the acceleration of the energy transition.

We'd be happy to support you with your project—please let us know how we can help.

 

Do you have a question about our services or what we offer, or would you like to schedule an appointment? Please don't hesitate to contact us or fill out the form on the contact page.

We'll take it like that We will contact you as soon as possible.

We look forward to a long-term partnership!

BUILLT®

  • Ekkersrijt 7051
  • 5692 HB Son en Breugel
  • The Netherlands