Moerdijk Bridge is fully accessible!
Commissioned by CT de Boer, BUILLT provided temporary access for the construction work on the Moerdijk Bridge, one of the most important transportation links between South Holland and North Brabant. The work was part of the replacement of the bridge’s bearings, a critical component for the structure’s service life, safety, and reliability. From a crane barge, BUILLT engineered and installed access to nine piers and the internal tube connection between all the piers.
Due to its complex location above the Hollands Diep, this project required an innovative and safe approach. The work was carried out from a crane vessel, with our skilled workers using an aerial work platform to gain the necessary access to the underside of the bridge. This method allowed the work to be carried out safely, efficiently, and with minimal disruption to road traffic.
BUILLT provided consulting services and expertise in the areas of temporary access and safe workspaces at height. Thanks to careful preparation, meticulous execution, and continuous coordination with all parties involved, the work was completed on schedule.
The collaboration with CT de Boer and Rijkswaterstaat was characterized by open communication, mutual trust, and a shared focus on safety, quality, and efficiency. This close collaboration has once again demonstrated that complex infrastructure projects can be successfully carried out when specialized knowledge and an integrated project approach come together.
Through projects such as the Moerdijk Bridge, BUILLT contributes every day to the safe maintenance of the Dutch infrastructure and to ensuring its future-readiness.




Thanks to our extensive experience with complex infrastructure projects and working from a crane barge, we were able to implement a safe and efficient access solution for carrying out the work.
By utilizing 3D engineering, the entire access plan was digitally modeled in advance. This allowed risks to be identified early on, ensured optimal preparation for the project, and enabled the work to proceed safely and according to schedule.
Thorough preparation, a well-thought-out plan of action, and a rapid response time formed the foundation for this project’s success. In close collaboration with CT de Boer and Rijkswaterstaat, we consistently prioritized safety, quality, and efficiency. This collaborative approach resulted in a smooth implementation with minimal disruption and maximum reliability.
This project highlights BUILLT’s strength as a specialist in temporary access solutions for complex infrastructure projects, where safety, engineering, and craftsmanship go hand in hand.




Do you have a question about our services or what we offer, or would you like to schedule an appointment? Please don't hesitate to contact us or fill out the form on the contact page.
We'll take it like that
We look forward to a long-term partnership!