"Kop Dakpark" Takes Shape on a Compact Inner-City Site

In Rotterdam-West, Slokker Bouwgroep is constructing Kop Dakpark. The residential building, which features 153 affordable housing units and 600 m² of commercial space, is located at a busy traffic intersection in Bospolder-Tussendijken. The challenge is clear: to create a green, socially responsible building on a cramped and complex site.

The design originated from a Europan competition. A construction team then worked with Woonstad Rotterdam, INBO, consultants, and the Breda branch of Slokker Bouwgroep to develop the plan into a feasible project. Project manager Rik Fassaert of Slokker Bouwgroep explains: “We had a strong design, but we had to adapt it to comply with Dutch regulations and stay within the construction budget.” Together with consultants, the team examined the structure, materials, and floor plans. The homes were deliberately designed to be simple and efficient. At the same time, the ambition to give the building a distinct identity—particularly in the facade and outdoor spaces—remained intact.

Cramped construction site, tight schedule

The location poses significant challenges for the construction process. The construction area is limited and is located in the middle of a busy urban area. “Everything has to be perfectly timed here,” says Fassaert. The structural work is now nearing its highest point. At the same time, work on the facade is already underway, and the first scaffolding has been removed. Work on the roofs and finishing touches has also begun. This phased approach keeps the pace of construction high.

The facade as a key component

The facade required a great deal of research. The design consists of bold 3D elements, which had to be made technically and financially feasible. “We spent a long time looking for a solution that was affordable and feasible to build, while still maintaining the desired look,” said Fassaert.

Greenery as an integral part of the building

The building serves as an extension of the Dakpark. Rooftop gardens, courtyard gardens, and greenery along the galleries create a sense of cohesion. This green design is an integral part of both the design and construction phases. This requires coordination with suppliers and consultants, particularly regarding water retention and the installation of planters. According to Fassaert, the key lies in collaboration. “You do this together, from the initial design through to construction. That’s the only way to minimize risks and deliver quality.” Completion is scheduled for the first quarter of 2027.

 

Project Information

Commissioned by Slokker Bouwgroep Breda, BUILLT is contributing to the construction of KOP Dakpark in Rotterdam. This striking new development comprises 153 rental units and commercial spaces and connects to the existing Dakpark, thereby providing a new impetus to the area’s development in Rotterdam-West.

Due to the compact, inner-city construction site and the complex construction phasing, safety, logistics, and accessibility are of essential importance.

BUILLT handles the engineering, delivery, assembly, and disassembly of various scaffolding structures, temporary access facilities, and numerous support structures. Using 3D engineering, all structures are designed in advance, ensuring that the project is carried out safely, efficiently, and predictably.

Thanks to thorough preparation, short lines of communication, and flexible collaboration with Slokker Bouwgroep, BUILLT is contributing to the safe and successful completion of this sustainable construction project.

We'd be happy to support you with your project—please let us know how we can help.

 

Do you have a question about our services or what we offer, or would you like to schedule an appointment? Please don't hesitate to contact us or fill out the form on the contact page.